Download details |
LAKOTA and Longbow TECHNICAL BULLETIN - 4 | |||||||||||||
Always perform this check prior to connecting the LAKOTA’s three phase wires at the top of the pole or mount or before closing the rear access panel on the head of the turbine if a wind optimization setting has been changed. |
|